• Latviski
  • English
  • По-русски
  • About us
  • Products
  • Engeneering
  • Technical support
  • News
  • Vakancies
  • Contacts
  • Mission
  • History
  • Occupational health and safety
  • Environmental policy
  • Certificates and approvals
  • Realised projects
    • Republic of Belarus
    • Republic of Kazakhstan
    • Russian Federation

Realised projects

Gas treatment point for the OJSC "Belaruskali"

Gas treatment point for the OJSC "Belaruskali"

Automatic Gas Treatment Point for the OJSC "Krasnoselskstroimaterialy"

Automatic Gas Treatment Point for the OJSC "Krasnoselskstroimaterialy"

Gas metering units for the OJSC "Beltransgaz" 5 pcs.

Gas metering units for the OJSC "Beltransgaz" 5 pcs.

Main gas pipeline Kazakhstan – China (310 km)

Main gas pipeline Kazakhstan – China (310 km)

123456789
  • © EM group of companies.
  • Made by web-design.lv
  • Address: Daugavgrīvas iela 93, Rīga, LV-1007
  • Email: info@intraem.com
  • Phone: +371 67 169 866
  • Fax: +371 67 169 867
  • Google+